Safe Working Practice. Test 2

Safe Working Practice. Test 2

/
The responsibility for safety and security rests with everybody on board the vessel. General house-keeping rules should be followed. Which of the listed rules is the most important?
Question Image
Why shall engine and boiler rooms be kept clean and oil spillage removed?
Question Image
Welding and use of open flames on board tankers in operation are subject to regulation laid down by the Norwegian Maritime Directorate (Norwegian Ship Control Legislation - NSCL). Which of the listed requirements regarding washing and gas freeing before hot work in cargo tanks corresponds to these regulations? (NSCL 22/1294/5).
Question Image
What precaution is to be taken when the Engineer on Duty is entering an UMS-mode operated engine room due to an alarm or due to a scheduled routine check?
Question Image
Which routine procedures should be carried out before 'hot work' commences?
Question Image
Electric arc welding is to be carried out in the machinery spaces other than the workshop. Which of the alternatives below would be the correct procedure for the connection of the 'return' cable to the welding set?
Question Image
When the engine room crane is to be utilised for lifting or lowering a piece of equipment to the lower decks through access hatches designed specifically for the purpose, there are certain measures that should be taken. What are they?
Question Image
What is the safe time for operating the crankcase door when oil mist alarm is activated and the engine has been stopped?
Question Image
What will you do if you have a flash-back during gas welding?
Question Image
When using corrosive chemicals for cleaning purposes, should you:
Question Image