Maintenance Planning. Test 2

Maintenance Planning. Test 2

/
It is very important to follow a maintenance schedule for purifiers. Why?
Question Image
In the starting air layout shown what is the purpose of item 'A'?
Question Image
How often shall the oxygen analyser be calibrated?
Question Image
You are going to overhaul a centrifugal pump in accordance with the PMS. The pump is running under optimal conditions and normally operated. Which of the following parts are expected to deteriorate during normal operation and thereby be due for renewal?
Question Image
What is the most practical way to control the humidity of the cooled air to the accommodation as well as efficiency control in tropical climates ?
Question Image
What is the most important connection with the deck department for the chief engineer ?
One of the Main Engine cooling pumps is down for maintenance. The rest of the cooling pumps are operating on full capacity with minimum margins on the maximum temperature limit. What will be the correct precaution or action to take at the end of the day?
Question Image
After how many hours would you consider changing the turbocharger bearings, even though all appears to be normal?
Question Image
How will continuous low load operation influence the service interval of the cylinder covers on a 4-stroke engine?
Question Image
You are required to order 1 years supply of refrigerant compressor oil and you estimate that consumption will be 480 litres in that time. If there is already an open drum of 180 litres on board, what will you order ?
Question Image
Check Answers