Maintenance, Repair. Test 29

Maintenance, Repair. Test 29

/
Controllable or variable pitch propellers are _____
When cleaning or overhauling purifiers, which of the following applies ?
In an auxiliary diesel engine the connecting rod would join which of the following items ?
Plate or tubular heat exchangers are used for which of the following ?
The ship's steering gear uses _____
What is shown on the left side of the picture ?
Question Image
A tool used to mark the centre for a twist drill is called _____
The abbreviation L.O. stands for _____
On a modern ship the main engine lubricating oil is cooled by which of the following ?
Pressure can be measured by the use of a _____
Check Answers
Review Answers
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected :(

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.
Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock