Automation, Control Equipment. Test 2

Automation, Control Equipment. Test 2

/
Please indicate the correct sequence of action to take place in an alarm/monitoring and safety system.
Question Image
For any engine room operated in UMS-mode, defined checks are to be carried out prior to switching to UMS-mode. Is it the Engineer on Duty's responsibility to have the full control of condition of any check items prior to switching to UMS-mode and leaving the engine room, or may he leave the engine room for a short period trusting the alarms and automatic functions are sufficient for safe operation?
Question Image
What is the meaning of the expression dead-band
Question Image
Which of the logic statements is correct for this pneumatic system?
Question Image
In some cases we can see that a resistor is connected over an alarm contact (see diagram). Why is this connection used?
Question Image
In a circuit diagram of a simple hydraulic circuit, what does the following symbol indicate?
Question Image
Which push-button valve A, B or C must be pushed (operated) in order to obtain movement of the pneumatic cylinder S?
Question Image
During synchronising, the incoming generator should be running slightly 'fast' compared to the busbar frequency.This is to ensure that the:
Question Image
During a routine seapassage the cooling water high temperature alarm system for one of the auxiliary engines is out of function and blocked. What will be the appropriate immediate action?
Question Image
Which group of electrical services are likely to be supplied from an emergency generator?
Question Image
Check Answers
Review Answers